Project Highlights
- BIM Coordinated, Design Assist Contract
- Welded Chilled Water Piping system up to 42" in diameter
- Installation of six 2500-ton chillers for 15,000 tons cooling capacity with future expansion planned
This chiller plant is currently under construction at The Ohio State University. When completed it will serve the new Cancer Care Tower, medical buildings, and other buildings on the South Campus.
The project includes chilled water piping up to 42" in diameter and (6) 2500-ton chillers. The project is fully BIM coordinated and is being constructed to accommodate future expansions of equipment and piping.
Kirk Williams Company is proud to have been selected for this project whose world-class team includes RMF Engineering, Ross Barney Architects, Whiting-Turner, and Champlin Architecture.