"This was a challenging project from the standpoint of the major changes in design along the way, as well as the time constraints that had to be met to complete this construction. The scope of work that was performed by your company was very critical to the success of this project and was performed in a very professional manner. Kirk Williams Company was a very viable partner in assisting with problem solving and was very solutions oriented."

Todd A. Wilkinson
Elford, Inc.
St. Ann’s Hospital Clinical Lab Relocation

 

"Based on our long relationship with the owner, The Kirk Williams Company was selected as our mechanical contractor for the Honda Marysville Assembly Line #2 project. From bid process through project completion, The Kirk Williams Company showed attention to detail, a willingness to coordinate with other contractors, and a 'pro-active' stance on all facets of the project. Safety and efficiency on the job site were of the highest priority. J & R Design Systems, Inc. will continue to use the services of Kirk Williams Company for future projects."

Chris Schweizer
J & R Design Systems, Inc.

Projects

Laboratory

Wright Patterson Airforce Base: 711th Human Performance Wing

  • $35.5 million HVAC Design Assist Contract
  • 680,000 square foot Laboratory and Research Facility
  • BSL-3 Laboratory, Custom Welded Stainless Steel Exhaust, Laboratory grade piping
Athletic

Value City Arena at the Jerome Schottenstien Center

  • $116 million athletic and multipurpose facility
  • Home to OSU Men’s and Women’s Basketball Teams, as well as the OSU Men’s Ice Hockey Team
  • Largest Arena in the Big Ten Conference

The Capital University Capital Center

  • 126,000 square foot athletic and recreation complex
  • 51,000 square foot multipurpose forum
  • 5,000 square foot fitness center
Healthcare

The Veterans Administration Chalmers P. Wylie Outpatient Clinic

  • Design-build
  • 300,000 square foot
  • $75 million health care facility

Saint Mary of the Springs Mother House

  • Houses the order’s headquarter offices
  • Also serves as the residence for the sisters
  • The chapel won the 2007 AIA’s Institute Honor Award for Interior Architecture
Industrial

The Ohio State University McCracken Power Plant

  • Various projects
  • Boiler Replacement – 2007
  • Steam Tunnel projects

OSU South Campus Central Chiller Plant

University

OSU New Physics Research Building

  • $50 million research facility
  • 210 laboratory modules
  • 234,000 square feet
Warehouse

USPS Processing and Distribution Facility

  • Design-build
  • 900,000 square foot
  • 9 miles of ductwork
Office

The School Employees Retirement System of Ohio Headquarters

  • 200,000 square feet
  • 10-story office building
  • 530-car parking garage
Specialty

Specialty Fabrication

  • If it is made from metal and/or pipe, we can make it for you at Kirk Williams Company
  • Below is a sampling of the projects we can manufacture in our state-of-the-art facility:
  • Ductwork, piping, handrails, belt guards, structural steel platforms and mezzanines, tanks, chutes, screens, grilles, dampers, bag houses, sleeves, flashing, bins, pumping packages, conveyor guards, silhouettes, oven panels, booths, stairs, piping skids, ornamental metal and much more.